Articles

Writing a PAS128 Survey Specification: What to Include in Your Brief

Published 12 November 2026

Subvision surveyor carrying out a GPR utility survey on a construction site

Send the same site out to three utility surveyors and the quotes that come back can look very different, both in price and in what you get for it. Most of that difference comes from the brief. If the specification just says “PAS128 survey required”, each surveyor has to guess which survey types you need, how much of the site to cover and how accurate the results need to be. You end up comparing quotes that aren’t like for like, and you may not find the gaps until the drawings arrive.

This guide covers what a PAS128 brief should include, so the survey you commission matches the risk on your site.

Reference PAS 128:2022 in Your Specification

Older tender templates still mention PAS 128:2014, which has been withdrawn. Name PAS 128:2022 in your specification so every surveyor quotes against the same requirements. That includes the newer guidance on practitioner training and qualifications, and the more detailed rules on survey methodology.

Which PAS128 Survey Types to Specify

PAS128 is built around four survey types. Your brief should say which ones you need and over which parts of the site.

Survey Type D: Desktop Utility Records Search

This comes before every other survey type. If you already hold recent, reliable records from the asset owners you can supply them. If not, include a utility search pack in the scope.

Survey Type C: Site Reconnaissance

This is a walkover that matches the records to what can be seen on site: covers, street furniture, reinstatement scars. It’s usually done at the same time as the detection survey, but ask for it in writing rather than assuming it’s included.

Survey Type B: Detection

This is the full utility mapping survey. Specify electromagnetic locator (EML) and ground penetrating radar (GPR) as the minimum, with other techniques added where ground conditions need them. Say whether you also want positions and depths marked on the ground.

Survey Type A: Verification

This means seeing the utility directly, either in an inspection chamber or by exposing it in a trial hole. Chamber inspections carried out during a Type B survey count as Type A data, so ask for photographs and chamber records for every accessible cover.

Setting Target Quality Levels Across Your Site

Each section of a detected utility is given a quality level. In a detection survey this runs from QL-B4 (a utility is suspected but wasn’t detected) up to QL-B1 (position and depth detected with a high degree of confidence).

Requiring QL-B1 everywhere isn’t usually sensible. Congested footways, made ground and reinforced slabs can all limit what any detection survey can achieve. It’s better to split the site into zones and say what each one needs. For example:

  • Piling footprint, drainage runs and new service connections: highest achievable quality level, with trial holes or virtual trial holes where certainty matters.
  • General working areas and haul routes: detection survey with depths where achievable.
  • Soft landscaping with no planned excavation: records search and site reconnaissance may be enough.

This gives the surveyor a clear target and means effort goes where the excavation risk is.

Specifying the Methodology Type for Detection Surveys

Under PAS 128:2022, a detection survey is carried out to a set Methodology Type, which describes how intensive the work on site is. A higher Methodology Type means more survey effort and a better chance of reaching the higher quality levels.

Ask each surveyor to state which Methodology Type they’re quoting for and why. A low price often reflects a lighter survey, and this is the line in the quote that shows it.

Survey Boundary, Existing Data and Coordinate System

Mark the survey area with a red-line boundary, ideally as a CAD or GIS file rather than a marked-up PDF. Include any existing topographical survey so the utility data can be laid over it. State the coordinate system and level datum you work to, normally OS National Grid and Ordnance Datum, so the results drop straight into your design model.

If there’s no topographical survey yet, it’s often more efficient to commission both at the same time, so the utilities and site features share one survey control.

Site Access, Traffic Management and Working Hours

Access problems are among the most common reasons a utility survey comes back with gaps. Your brief should cover:

  • whether the survey area includes live carriageway, and who arranges permits and traffic management
  • any restrictions on working hours, including night or weekend working on busy sites
  • site induction requirements and who the surveyor reports to on arrival
  • whether chamber covers can be lifted, and any confined-space restrictions
  • parked vehicles, stored materials or hoarding that could block coverage

PAS128 Deliverables to Agree Before Work Starts

Agree the outputs at quotation stage so there’s no back-and-forth afterwards. As a minimum, ask for:

  • CAD drawings in your required format and version, plus PDF copies
  • a quality level given for each section of every utility shown
  • a record of which detection techniques were used in each area
  • chamber photographs and chamber records
  • a report setting out limitations, areas not surveyed and the reasons why

PAS128 Survey Specification Checklist

  • PAS 128:2022 named as the governing specification
  • Survey types required (D, C, B, A), with the extent of each
  • Target quality level for each zone of the site
  • Methodology Type requested or proposed by the surveyor
  • Red-line boundary and existing survey data supplied digitally
  • Coordinate system and level datum confirmed
  • Access, permits, working hours and site rules set out
  • Deliverables, formats and reporting requirements listed

Need Help Scoping Your PAS128 Survey?

If you’re unsure how to zone your site or which quality levels are realistic, our surveyors can review your drawings and recommend a scope before you go out to tender. The team is NVQ Level 3 and Level 5 QCF qualified, based in Essex and working nationwide. Find out more about our PAS128 surveys, or call 0333 920 9427 for a free quote.

Need some advice?

Speak to the Subvision team

Planning a survey or not sure which method suits your site? Our team is based in Essex and works nationwide, and we’re happy to talk it through.